Arsenals New £390m Emirates
Stadium

The complete HV & LV installation package for Arsenals'
Emirates stadium was carried out by Premier Cable Installations between 2005-2006. Whilst other stadiums erected
at the same time failed to complete on time , the Emirates was completed ahead of schedule & within budget.
Nottingham Express Transit

The future of Nottinghams public transport was unveiled in
2004. Premier Cable Installations had installed & terminated the power cables to supply the entire network, on and off
street, for the 14.5 km track, with minimal disruption to local residents and motorists. Our contract included
the logisitcs of each operation over a 12 month period. This included liasing with traffic management and the co-ordination
of the cable deliveries to ensure a smooth running installation, which hit every deadline set, throughout
the year long project.
|